Li-FT Power (TSXV: LIFT; ASX: LFT) has intersected 45 metres at 2.71% lithium oxide at its Adina project in Quebec, strengthening the case for adding high-grade material from the Galinée zone to an updated resource and economic study.

The interval began at 164 metres downhole in hole ALP0007. Other Galinée results included 25 metres at 2.71% lithium oxide from 185 metres in ALP0016 and 12 metres at 3.14% from 185 metres in ALP0014, the Vancouver-based company reported Tuesday . All intervals are downhole lengths; true thicknesses are unknown.

“Galinée is delivering exactly what we hoped for when we consolidated it into the project in May,” CEO Francis MacDonald said.

The drilling will feed into a resource update and preliminary economic assessment targeted for early 2027. Li-FT is assessing whether it can process Adina’s spodumene-bearing ore using infrastructure at the former Renard diamond operation, about 60 km to the south, potentially reducing the amount of new construction required.