Marimaca Copper (TSX: MARI; ASX: MC2) has cut 216 metres grading nearly 1% copper at Pampa Medina in Chile’s Antofagasta Region while step-out drilling pushed the copper-silver system 300 metres beyond earlier holes.

Hole SPRD-15 returned 216 metres grading 0.96% copper and 7.2 grams silver per tonne from 466 metres downhole, including 62 metres at 2.2% copper and 21.5 grams silver from 602 metres, Marimaca said Tuesday. Pampa Medina lies 28 km east of Marimaca’s more advanced oxide depositwithin 40 km of Antofagasta, the mining region’s capital.

“Pampa Medina remains open in several directions and is materially under-tested,” Vice-President of Exploration Sergio Rivera said in a release. ”These results continue to strengthen our view that we are defining a large, high-grade copper-silver system.”.