Peninsula Energy (ASX: PEN) announced that it has received approval from Wyoming’s Uranium Recovery Program (URP) to commence start-up of Phase 2 of the central processing plant (CPP) at the Lance project.
Lance represents one of the largest US uranium projects in size and scale, with a defined JORC (2012) resource of 58 million lb. of uranium oxide (U 3 O 8 ). The mine restart plan envisions an initial 10-year in-situ recovery operation with a production estimate of 4.1 million lb. from the Ross area, then moving onto the Kendrick area.
The approval means that Peninsula can now progress transferring uranium on resin into Phase 2 of the CPP, utilizing recovery process solutions to operate the process circuits. No further regulatory approvals are necessary to commence commercial production in Wyoming, the company said.
On completion of Phase 2 construction, the Lance projects will be home to a 5,000 GPM uranium recovery ion-exchange process plant, with the capability to independently produce up to 2 million lb. per annum of dry yellowcake product, the company said in December.


